SC240.8LC Lishide excavator specs & Dimensions (2019 - 2025)
Technical specs - SC240.8LC Lishide
Specification
Notice: Every data listed is verified by LECTURA Specs team experts. However, incomplete data and mistakes might occur. Contact our team with any change suggestion.
- Weight
- 24.282 t
- Transport length
- 9.89 m
- Transport width
- 3.28 m
- Transport height
- 3.12 m
- Bucket capacity
- 1.2 m³
- Track width
- 700 mm
- Boom
- MB
- Max. Reach horizontal
- 10.15 m
- Dredging depth
- 6.875 m
- Tear-out force
- 151 kN
- Model series
- Middle
- Engine manuf.
- Cummins
- Engine type
- B5.9-C
- Engine power
- 133 kW
More technical details, like: bucket capacity min., bucket capacity max., undercarriage, bucket width, dimension lxwxh, displacement, revolutions at max torque, max. torque, no. of cylinders, cylinder bore x stroke, emission level are available in the full technical specs.
Basic model incl. ROPS cabin, traction drive, standard boom and standard bucket
Special equipment
- Diesel particulate filter
-
No
- Track adjustment
-
No
- Blade
-
No
- Cabin adjustment
-
Yes
- Overload alert
-
No
- Material Handling Excavator
-
No
- Aircondition
-
Yes
- Quick hitch hydr.
-
No
- Quick hitch mech.
-
No
Download datasheets (PDF)
Lishide SC240.8LC FAQ
How much does the Lishide SC240.8LC weigh?
What are the transport dimensions of the Lishide SC240.8LC crawler excavator?
What is the track width of the Lishide SC240.8LC's undercarriage?
What are the excavation performance specifications of the Lishide SC240.8LC crawler excavator?
What is the tear-out force of the Lishide SC240.8LC?
What is the bucket capacity of the Lishide SC240.8LC excavator?
How much is a Lishide SC240.8LC Crawler excavator (2019u20132025) worth?
Machine inspection
Ask for inspection of your Lishide SC240.8LC from experts
Mevas is an international operating inspection service for used heavy machinery. Construction machinery inspectors are available in more than 20 countries.
Use this service to minimise the risk when buying used equipment. An inspection by Mevas costs less than repairing a defective hydraulic cylinder.
Provided by:
Buy & Rent
Compare Lishide SC240.8LC with similar Crawler Excavators
Lishide SC240.8LC
- Weight:
- 24.282 t
- Transport length:
- 9.89 m
- Transport width:
- 3.28 m
- Transport height:
- 3.12 m
Liebherr R 926
- Weight:
- 25.3 t
- Transport length:
- 9.4 m
- Transport width:
- 2.38 m
- Transport height:
- 3.07 m
Hidromek HMK 220 LC
- Weight:
- 22.3 t
Zoomlion ZE210E
- Weight:
- 21.3 t
- Transport length:
- 9.57 m
- Transport width:
- 2.8 m
- Transport height:
- 3.01 m
Doosan Solar 220 LC-III
- Weight:
- 20.1 t
- Transport length:
- 9.63 m
- Transport width:
- 2.98 m
- Transport height:
- 2.99 m
Check other popular models from Crawler Excavators
Sell Lishide SC240.8LC
Crawler Excavators appraisal with LECTURA Valuation
Whether you need to get value of your Lishide SC240.8LC or appraisal of your Crawler Excavators fleet, LECTURA Valuation will help. Simply fill the machine details and see the values for Crawler Excavators in few clicks.
Data provided by
Spare parts & Components
Get spare parts for Lishide SC240.8LC easily from our partners
Do your lookup for high quality parts for Lishide SC240.8LC online!
With a few, easy steps, you will find generic and genuine parts and replacements in well-catalogued lists. Wether you are dealer or an owner, LECTURA can lead you to the right direction.
Check the best offers from our partners and order the Crawler Excavators spare parts easily today - worldwide.
Transport
Crawler Excavators Transport & Shipping Services
In case you want a transport for your machine, take advantage of our services. Enquire the ideal transport quotes for Crawler Excavators built on transport dimensions and machine's weight. Our partners provide various options and services to meet your demands.
Data provided by
News
Construction News by LECTURA 28.06.2026
CECE Technical Week June 2026: Advancing alignment across digital, environmental and machinery frameworks
The CECE Technical Commission (TC) and its Project Teams (PTs) convened for the second quarterly "Technical Week" meetings of the year, held from15th to 18th June.