Visit XCMG live at
Technical specs - XE1250G XCMG
Specification
Notice: Every data listed is verified by LECTURA Specs team experts. However, incomplete data and mistakes might occur. Contact our team with any change suggestion.
- Weight
- 120 t
- Transport length
- 14.77 m
- Transport width
- 5.54 m
- Transport height
- 6.61 m
- Bucket capacity min.
- 5.1 m³
- Bucket capacity max.
- 6.8 m³
- Boom
- MB
- Model series
- XE
Basic model incl. ROPS cabin, traction drive, standard boom and standard bucket
Special equipment
- Diesel particulate filter
-
No
- Track adjustment
-
No
- Blade
-
No
- Cabin adjustment
-
No
- Overload alert
-
No
- Material Handling Excavator
-
No
- Aircondition
-
Yes
- Quick hitch hydr.
-
No
- Quick hitch mech.
-
No
Events
Visit XCMG live at
Machine inspection
Ask for inspection of your XCMG XE1250G from experts
Mevas is an international operating inspection service for used heavy machinery. Construction machinery inspectors are available in more than 20 countries.
Use this service to minimise the risk when buying used equipment. An inspection by Mevas costs less than repairing a defective hydraulic cylinder.
Provided by:
Buy & Rent
Compare XCMG XE1250G with similar Crawler Excavators
XCMG XE1250G
- Weight:
- 120 t
- Transport length:
- 14.77 m
- Transport width:
- 5.54 m
- Transport height:
- 6.61 m
Bucyrus RH40E
- Weight:
- 108.35 t
- Transport width:
- 5.34 m
Check other popular models from Crawler Excavators
Spare parts & Components
Get spare parts for XCMG XE1250G easily from our partners
Do your lookup for high quality parts for XCMG XE1250G online!
With a few, easy steps, you will find generic and genuine parts and replacements in well-catalogued lists. Wether you are dealer or an owner, LECTURA can lead you to the right direction.
Check the best offers from our partners and order the Crawler Excavators spare parts easily today - worldwide.
Transport
Crawler Excavators Transport & Shipping Services
In case you look for a transport your machine, utilise our services. Examine the best fitting transport quotes for Crawler Excavators built on transport dimensions and machine weight. Our partners provide extensive options to satisfy your demands.
Data provided by
News
Construction News by LECTURA 28.06.2026
CECE Technical Week June 2026: Advancing alignment across digital, environmental and machinery frameworks
The CECE Technical Commission (TC) and its Project Teams (PTs) convened for the second quarterly "Technical Week" meetings of the year, held from15th to 18th June.