Visit Liugong live at
Technical specs - CLG220LC Liugong
Specification
Notice: Every data listed is verified by LECTURA Specs team experts. However, incomplete data and mistakes might occur. Contact our team with any change suggestion.
- Weight
- 20.7 t
- Transport length
- 9.52 m
- Transport width
- 2.99 m
- Transport height
- 2.89 m
- Bucket capacity min.
- 0.73 m³
- Bucket capacity max.
- 1 m³
- Undercarriage
- LC
- Track width
- 600 mm
- Boom
- MB
- Max. Reach horizontal
- 9.82 m
- Dredging depth
- 6.35 m
- Tear-out force
- 120 kN
- Engine manuf.
- Cummins
- Engine type
- 85.9-C
- Engine power
- 108 kW
- Displacement
- 5.9 l
- Revolutions at max torque
- 1600 rpm
- Max. torque
- 597 Nm
- No. of cylinders
- 6
- Cylinder bore x stroke
- 102 x 120 mm
More technical details, like: bucket capacity, bucket width, model series, dimension lxwxh, emission level are available in the full technical specs.
Basic model incl. ROPS cabin, traction drive, standard boom and standard bucket
Special equipment
- Diesel particulate filter
-
No
- Track adjustment
-
No
- Blade
-
No
- Cabin adjustment
-
No
- Overload alert
-
No
- Material Handling Excavator
-
No
- Aircondition
-
No
- Quick hitch hydr.
-
No
- Quick hitch mech.
-
No
Download datasheets (PDF)
Liugong CLG220LC FAQ
How much does the Liugong CLG220LC weigh?
What are the transport dimensions of the Liugong CLG220LC crawler excavator?
What are the undercarriage specifications of the Liugong CLG220LC?
What are the excavation performance specifications of the Liugong CLG220LC crawler excavator?
What is the tear-out force of the Liugong CLG220LC?
What is the maximum bucket capacity of the Liugong CLG220LC?
How much is a Liugong CLG220LC Crawler excavator (2007u20132025) worth?
Events
Visit Liugong live at
Machine inspection
Ask for inspection of your Liugong CLG220LC from experts
Mevas is an international operating inspection service for used heavy machinery. Construction machinery inspectors are available in more than 20 countries.
Use this service to minimise the risk when buying used equipment. An inspection by Mevas costs less than repairing a defective hydraulic cylinder.
Provided by:
Buy & Rent
Compare Liugong CLG220LC with similar Crawler Excavators
Liugong CLG220LC
- Weight:
- 20.7 t
- Transport length:
- 9.52 m
- Transport width:
- 2.99 m
- Transport height:
- 2.89 m
Hidromek HMK 220 LC
- Weight:
- 22.3 t
Zoomlion ZE210E
- Weight:
- 21.3 t
- Transport length:
- 9.57 m
- Transport width:
- 2.8 m
- Transport height:
- 3.01 m
Doosan Solar 220 LC-III
- Weight:
- 20.1 t
- Transport length:
- 9.63 m
- Transport width:
- 2.98 m
- Transport height:
- 2.99 m
Case Poclain 125 CK B
- Weight:
- 23.7 t
- Transport length:
- 9.05 m
- Transport width:
- 2.9 m
- Transport height:
- 3.05 m
Check other popular models from Crawler Excavators
Sell Liugong CLG220LC
Crawler Excavators appraisal with LECTURA Valuation
Whether you need to get price of your Liugong CLG220LC or valuation of your Crawler Excavators fleet, LECTURA Valuation will help. Simply fill the machine details and see the values for Crawler Excavators in few clicks.
Data provided by
Spare parts & Components
Get spare parts for Liugong CLG220LC easily from our partners
Do your lookup for high quality parts for Liugong CLG220LC online!
With a few, easy steps, you will find generic and genuine parts and replacements in well-catalogued lists. Wether you are dealer or an owner, LECTURA can lead you to the right direction.
Check the best offers from our partners and order the Crawler Excavators spare parts easily today - worldwide.
Transport
Crawler Excavators Transport & Shipping Services
In case you look into transport options for your machine, utilise our services. Query the ideal transport quotes for Crawler Excavators built on transport dimensions and machine weight. Our partners provide extensive services to meet your demands.
Data provided by
News
Construction News by LECTURA 27.06.2026
CECE Technical Week June 2026: Advancing alignment across digital, environmental and machinery frameworks
The CECE Technical Commission (TC) and its Project Teams (PTs) convened for the second quarterly "Technical Week" meetings of the year, held from15th to 18th June.