Visit Kobelco live at
Technical specs - SK 135 SRLC Kobelco
Specification
Notice: Every data listed is verified by LECTURA Specs team experts. However, incomplete data and mistakes might occur. Contact our team with any change suggestion.
- Weight
- 14 t
- Transport length
- 7.47 m
- Transport width
- 2.59 m
- Transport height
- 2.81 m
- Bucket capacity
- 0.7 m³
- Undercarriage
- LC
- Track width
- 600 mm
- Max. Reach horizontal
- 8.86 m
- Dredging depth
- 6.01 m
- Tear-out force
- 8.62 kN
- Engine manuf.
- Isuzu
- Engine type
- A 4 BG 1 T
- Engine power
- 63 kW
More technical details, like: bucket capacity min., bucket capacity max., boom, bucket width, model series, dimension lxwxh, displacement, revolutions at max torque, max. torque, no. of cylinders, cylinder bore x stroke, emission level are available in the full technical specs.
Basic model incl. ROPS cabin, traction drive, standard boom and standard bucket
Special equipment
- Diesel particulate filter
-
No
- Track adjustment
-
No
- Blade
-
No
- Cabin adjustment
-
No
- Overload alert
-
No
- Material Handling Excavator
-
No
- Aircondition
-
Yes
- Quick hitch hydr.
-
No
- Quick hitch mech.
-
No
Download datasheets (PDF)
Kobelco SK 135 SRLC FAQ
How much does the Kobelco SK 135 SRLC weigh?
What are the transport dimensions of the Kobelco SK 135 SRLC?
What are the undercarriage specifications of the Kobelco SK 135 SRLC?
What are the dredging depth and maximum horizontal reach of the Kobelco SK 135 SRLC?
What is the tear-out force of the Kobelco SK 135 SRLC?
What is the bucket capacity of the Kobelco SK 135 SRLC excavator?
How much is a Kobelco SK 135 SRLC Crawler excavator (1999u20132003) worth?
Events
Visit Kobelco live at
Machine inspection
Ask for inspection of your Kobelco SK 135 SRLC from experts
Mevas is an international operating inspection service for used heavy machinery. Construction machinery inspectors are available in more than 20 countries.
Use this service to minimise the risk when buying used equipment. An inspection by Mevas costs less than repairing a defective hydraulic cylinder.
Provided by:
Buy & Rent
Compare Kobelco SK 135 SRLC with similar Crawler Excavators
Kobelco SK 135 SRLC
- Weight:
- 14 t
- Transport length:
- 7.47 m
- Transport width:
- 2.59 m
- Transport height:
- 2.81 m
Case CX 130
- Weight:
- 12.6 t
- Transport length:
- 7.49 m
- Transport width:
- 2.69 m
- Transport height:
- 2.74 m
JCB 814 S
- Weight:
- 14.9 t
Fiat-Hitachi FH 120
- Weight:
- 12.6 t
- Transport length:
- 7.69 m
- Transport width:
- 2.59 m
- Transport height:
- 2.71 m
Samsung SE 130 W-2
- Weight:
- 14.6 t
- Transport length:
- 7.42 m
- Transport width:
- 2.5 m
- Transport height:
- 4 m
Do you want to see more detailed comparison?
Show me!Check other popular models from Crawler Excavators
Sell Kobelco SK 135 SRLC
Crawler Excavators appraisal with LECTURA Valuation
Whether you need to get price of your Kobelco SK 135 SRLC or valuation of your Crawler Excavators fleet, LECTURA Valuation will help. Simply fill the machine details and see the pricing information for Crawler Excavators in few clicks.
Data provided by
Spare parts & Components
Get spare parts for Kobelco SK 135 SRLC easily from our partners
Do your lookup for high quality parts for Kobelco SK 135 SRLC online!
With a few, easy steps, you will find generic and genuine parts and replacements in well-catalogued lists. Wether you are dealer or an owner, LECTURA can lead you to the right direction.
Check the best offers from our partners and order the Crawler Excavators spare parts easily today - worldwide.
Transport
Crawler Excavators Transport & Shipping Services
In case you look into transport options for your machine, utilise our services. Query the ideal transport quotes for Crawler Excavators created on transport dimensions and machine weight. Our partners provide extensive services to meet your requirements.
Data provided by
News
Construction News by LECTURA 28.06.2026
CECE Technical Week June 2026: Advancing alignment across digital, environmental and machinery frameworks
The CECE Technical Commission (TC) and its Project Teams (PTs) convened for the second quarterly "Technical Week" meetings of the year, held from15th to 18th June.