AR 80 e weycor AR 80 e Specifications & Technical Data (2016—2017)
Visit weycor live at
Technical specs - AR 80 e weycor
Specification
Notice: Every data listed is verified by LECTURA Specs team experts. However, incomplete data and mistakes might occur. Contact our team with any change suggestion.
- Weight
- 6.22 t
- Standard tyres
- 405/70 R 20
- Bucket width
- 2.15 m
- Bucket capacity
- 1 m³
- Bucket capacity min.
- 1 m³
- Steering mode
- KL
- Transport length
- 5.48 m
- Transport width
- 1.85 m
- Transport height
- 2.69 m
- Travel speed
- 20 km/h
- Max. discharge height
- 2.61 m
- Turning radius outside
- 4.23 m
- Lifting force
- 60.4 kN
- Model series
- AR
- Engine manuf.
- Deutz
- Engine type
- TCD3.6 L04
- Engine power
- 70 kW
- Displacement
- 3.62 l
- Revolutions at max torque
- 2200 rpm
More technical details, like: bucket capacity max., dimension lxwxh, max. torque, no. of cylinders, cylinder bore x stroke, emission level are available in the full technical specs.
Basic model with ROPS cabin, std. shovel and teeth
Special equipment
- Diesel particulate filter
-
No
- Swing loader
-
No
- telescopic
-
No
- Aircondition
-
No
- Quick hitch hydr.
-
Yes
- Quick hitch mech.
-
Yes
Download datasheets (PDF)
weycor AR 80 e FAQ
How much does the weycor AR 80 e wheel loader weigh?
What are the transport dimensions of the weycor AR 80 e wheel loader?
What is the travel speed of the weycor AR 80 e wheel loader?
What are the undercarriage specifications of the weycor AR 80 e wheel loader?
What are the maneuverability specifications of the weycor AR 80 e wheel loader?
What power ratings are available for the weycor AR 80 e wheel loader?
What is the maximum discharge height of the weycor AR 80 e wheel loader?
What are the specifications of the bucket on the weycor AR 80 e wheel loader?
How much is a weycor AR 80 e Wheel loader (2016u20132017) worth?
Events
Visit weycor live at
Machine inspection
Ask for inspection of your weycor AR 80 e from experts
Mevas is an international operating inspection service for used heavy machinery. Construction machinery inspectors are available in more than 20 countries.
Use this service to minimise the risk when buying used equipment. An inspection by Mevas costs less than repairing a defective hydraulic cylinder.
Provided by:
Buy & Rent
Compare weycor AR 80 e with similar Wheel Loaders
weycor AR 80 e
- Weight:
- 6.22 t
- Standard tyres:
- 405/70 R 20
- Bucket width:
- 2.15 m
- Bucket capacity:
- 1 m³
Redrock TH 280
- Weight:
- 6.45 t
- Standard tyres:
- 17.5x24
- Bucket capacity:
- 1.1 m³
Benfra 215 B
- Weight:
- 6.7 t
- Standard tyres:
- 14.9-24
- Bucket capacity:
- 1 m³
Weimar WL 470
- Weight:
- 5 t
- Standard tyres:
- 405/70 R 20
- Bucket capacity:
- 0.8 m³
Mecalac AS 900 tele
- Weight:
- 7.2 t
- Standard tyres:
- 16/17-20
- Bucket width:
- 1.95 m
- Bucket capacity:
- 0.9 m³
Sell weycor AR 80 e
Wheel Loaders appraisal with LECTURA Valuation
Whether you need to calculate value of your weycor AR 80 e or valuation of your Wheel Loaders fleet, LECTURA Valuation will help. Simply fill the machine information and see the values for Wheel Loaders in few clicks.
Data provided by
Spare parts & Components
Get spare parts for weycor AR 80 e easily from our partners
Do your lookup for high quality parts for weycor AR 80 e online!
With a few, easy steps, you will find generic and genuine parts and replacements in well-catalogued lists. Wether you are dealer or an owner, LECTURA can lead you to the right direction.
Check the best offers from our partners and order the Wheel Loaders spare parts easily today - worldwide.
Transport
Wheel Loaders Transport & Shipping Services
In case you look for a transport your machine, take advantage of our services. Look for favourable transport quotes for Wheel Loaders built on transport dimensions and machine's weight. Our partners provide various options to fit your demands.
Data provided by
News
Construction News by LECTURA 28.06.2026
CECE Technical Week June 2026: Advancing alignment across digital, environmental and machinery frameworks
The CECE Technical Commission (TC) and its Project Teams (PTs) convened for the second quarterly "Technical Week" meetings of the year, held from15th to 18th June.