Visit Dynapac live at
Technical specs - BG 37 Dynapac
Specification
Notice: Every data listed is verified by LECTURA Specs team experts. However, incomplete data and mistakes might occur. Contact our team with any change suggestion.
- Disc Ø
- 900 mm
- Disc Revolution Range
- 125 min-1
- Weight
- 74 kg
- Engine power
- 4 kW
- Power source
- Gasoline
- Model series
- BG
- Engine manuf.
- Honda
- Engine type
- GX160
- Displacement
- 0.163 l
- Revolutions at max torque
- 3600 rpm
- No. of cylinders
- 1
More technical details, like: type of disc, voltage, dimension lxwxh, max. torque, cylinder bore x stroke, emission level are available in the full technical specs.
Events
Visit Dynapac live at
Buy & Rent
Compare Dynapac BG 37 with similar Walk-behind Trowels
Dynapac BG 37
- Disc Ø:
- 900 mm
- Disc Revolution Range:
- 125 min-1
- Weight:
- 74 kg
- Engine power:
- 4 kW
Norton-Clipper CT 601 MP
- Disc Ø:
- 600 mm
- Weight:
- 62 kg
- Engine power:
- 2.9 kW
Belidor-Noggerath Levo 765 E
- Disc Ø:
- 765 mm
- Disc Revolution Range:
- 117 min-1
- Weight:
- 85 kg
- Engine power:
- 2.4 kW
Palme PP700B
- Disc Ø:
- 685 mm
- Weight:
- 76 kg
- Engine power:
- 4.1 kW
Spare parts & Components
Get spare parts for Dynapac BG 37 easily from our partners
Do your lookup for high quality parts for Dynapac BG 37 online!
With a few, easy steps, you will find generic and genuine parts and replacements in well-catalogued lists. Wether you are dealer or an owner, LECTURA can lead you to the right direction.
Check the best offers from our partners and order the Walk-behind Trowels spare parts easily today - worldwide.
Transport
Walk-behind Trowels Transport & Shipping Services
In case you look into transport options for your machine, apply our services. Seek for the best fitting transport quotes for Walk-behind Trowels built on transport dimensions and weight. Our partners provide comprehensive services to satisfy your demands.
Data provided by
News
Construction News by LECTURA 24.07.2026
New Wheeled Paver Delivers Impressive Performance in the Mont Blanc Tunnel
It’s a mammoth project: current plans foresee the complete renovation and modernisation of the Mont Blanc Tunnel over its full length of almost 12 km by 2042.