MS 3 HFB Müller MS 3 HFB Specifications & Technical Data (1996—2006)

Centrifugal force: 304kN – Static torque: 3kgm – Boom Lifting Torque: 60kN – Amplitude: 10.3mm – Frequency: 50Hz – Drive power: 70kW

Technical specs - MS 3 HFB Müller

Specification

Notice: Every data listed is verified by LECTURA Specs team experts. However, incomplete data and mistakes might occur. Contact our team with any change suggestion.

Centrifugal force
304 kN
Static torque
3 kgm
Boom Lifting Torque
60 kN
Amplitude
10.3 mm
Frequency
50 Hz
Drive power
70 kW
Weight
0.96 t
Model series
MS

Basic model without leader slide, hydraulic unit

Special equipment

Excavator attachment
No
Aggregate
No

Download datasheets (PDF)

Buy & Rent

Compare Müller MS 3 HFB with similar Vibro Hammers

Müller MS 3 HFB

Müller MS 3 HFB

Centrifugal force:
304 kN
Static torque:
3 kgm
Boom Lifting Torque:
60 kN
Amplitude:
10.3 mm
Tünkers HVB 33/30

Tünkers HVB 33/30

Centrifugal force:
330 kN
Static torque:
3.3 kgm
Boom Lifting Torque:
100 kN
Amplitude:
8.2 mm

Spare parts & Components

Get spare parts for Müller MS 3 HFB easily from our partners

Spare parts

Do your lookup for high quality parts for Müller MS 3 HFB online!
With a few, easy steps, you will find generic and genuine parts and replacements in well-catalogued lists. Wether you are dealer or an owner, LECTURA can lead you to the right direction.
Check the best offers from our partners and order the Vibro Hammers spare parts easily today - worldwide.

Transport

Vibro Hammers Transport & Shipping Services

In case you look for a transport your machine, apply our services. Examine the ideal transport quotes for Vibro Hammers based on transport dimensions and weights. Our partners provide large-scale options to meet your needs.

Data provided by Lectura logo

News

Construction News by LECTURA 12.06.2026

Stringless paving in Oregon

Stringless paving in Oregon

Kerb and gutter profiles for the new residential development in Springfield were paved over a distance of more than 730 m. The Wirtgen SP 15i played a decisive role in the fast completion of the paving project.