Insta Mole IM 105 MTM-Technik Insta Mole IM 105 Specifications & Technical Data (1996—1998)

Machine Ø: 105mm – Machine length: 1.58m – Air consumption: 2m³/min – No. of Blows: 4801/min – Weight: 85kg – Model series: Insta Mole

Technical specs - Insta Mole IM 105 MTM-Technik

Specification

Notice: Every data listed is verified by LECTURA Specs team experts. However, incomplete data and mistakes might occur. Contact our team with any change suggestion.

Machine Ø
105 mm
Machine length
1.58 m
Air consumption
2 m³/min
No. of Blows
480 1/min
Weight
85 kg
Model series
Insta Mole

Basic model without accessories

Special equipment

Starter mount
No
Pipe sleeve
No
Oil-fog lubricator
No

Buy & Rent

Compare MTM-Technik Insta Mole IM 105 with similar Soil Displacement Hammers

No image available

MTM-Technik Insta Mole IM 105

Machine Ø:
105 mm
Machine length:
1.58 m
Air consumption:
2 m³/min
No. of Blows:
480 1/min

Spare parts & Components

Get spare parts for MTM-Technik Insta Mole IM 105 easily from our partners

Spare parts

Do your lookup for high quality parts for MTM-Technik Insta Mole IM 105 online!
With a few, easy steps, you will find generic and genuine parts and replacements in well-catalogued lists. Wether you are dealer or an owner, LECTURA can lead you to the right direction.
Check the best offers from our partners and order the Soil Displacement Hammers spare parts easily today - worldwide.

Transport

Soil Displacement Hammers Transport & Shipping Services

In case you want a transport for your machine, apply our services. Search for favourable transport quotes for Soil Displacement Hammers built on transport dimensions and weights. Our partners provide large-scale options to fit your demands.

Data provided by Lectura logo

News

Construction News by LECTURA 12.06.2026

Stringless paving in Oregon

Stringless paving in Oregon

Kerb and gutter profiles for the new residential development in Springfield were paved over a distance of more than 730 m. The Wirtgen SP 15i played a decisive role in the fast completion of the paving project.