Visit Putzmeister live at
Technical specs - MP 25 Putzmeister
Specification
Notice: Every data listed is verified by LECTURA Specs team experts. However, incomplete data and mistakes might occur. Contact our team with any change suggestion.
- Delivery rate
- 25 l/min
- Delivery reach
- 40 m
- Delivery altitude
- 15 m
- Transport length
- 1.344 m
- Transport width
- 0.728 m
- Transport height
- 1.484 m
- Feed pressure
- 40 bar
- Drive power
- 5.5 kW
- Grain
- 4 mm
- Weight
- 273 kg
- Model series
- MP
Special equipment
- Remote control
-
No
- Automatic mode
-
No
Download datasheets (PDF)
Events
Visit Putzmeister live at
Buy & Rent
Compare Putzmeister MP 25 with similar Mortar Mixing Pumps
Putzmeister MP 25
- Delivery rate:
- 25 l/min
- Delivery reach:
- 40 m
- Delivery altitude:
- 15 m
- Transport length:
- 1.344 m
m-tec m 3
- Delivery rate:
- 22 l/min
- Delivery reach:
- 40 m
- Delivery altitude:
- 20 m
Putzmeister MP 25 D 6 Mixit
- Delivery rate:
- 25 l/min
- Delivery reach:
- 30 m
Uelzener Putzknecht S 44 FU 230/400 V
- Delivery rate:
- 20 l/min
- Delivery reach:
- 20 m
- Delivery altitude:
- 10 m
Spare parts & Components
Get spare parts for Putzmeister MP 25 easily from our partners
Do your lookup for high quality parts for Putzmeister MP 25 online!
With a few, easy steps, you will find generic and genuine parts and replacements in well-catalogued lists. Wether you are dealer or an owner, LECTURA can lead you to the right direction.
Check the best offers from our partners and order the Mortar Mixing Pumps spare parts easily today - worldwide.
Transport
Mortar Mixing Pumps Transport & Shipping Services
In case you look for a transport your machine, take advantage of our services. Seek for the best fitting transport quotes for Mortar Mixing Pumps based on dimensions and weight. Our partners provide major services to satisfy your needs.
Data provided by
News
Construction News by LECTURA 27.07.2026
New Wheeled Paver Delivers Impressive Performance in the Mont Blanc Tunnel
It’s a mammoth project: current plans foresee the complete renovation and modernisation of the Mont Blanc Tunnel over its full length of almost 12 km by 2042.