Visit Sennebogen live at
Technical specs - 870M E Hybrid Elektro Sennebogen
Specification
Notice: Every data listed is verified by LECTURA Specs team experts. However, incomplete data and mistakes might occur. Contact our team with any change suggestion.
- Weight
- 145 t
- Standard tyres
- 355/65-15
- Boom
- UA
- Outrigger stabilisers
- 4 2/4-fold
- Transport length
- 18.5 m
- Transport height
- 4.2 m
- Max. Reach horizontal
- 27 m
- Travel speed
- 4 km/h
- Engine manuf.
- k.A.
- Engine type
- Elektro
- Engine power
- 250 kW
Events
Visit Sennebogen live at
Machine inspection
Ask for inspection of your Sennebogen 870M E Hybrid Elektro from experts
Mevas is an international operating inspection service for used heavy machinery. Construction machinery inspectors are available in more than 20 countries.
Use this service to minimise the risk when buying used equipment. An inspection by Mevas costs less than repairing a defective hydraulic cylinder.
Provided by:
Buy & Rent
Compare Sennebogen 870M E Hybrid Elektro with similar Material Handlers
Sennebogen 870M E Hybrid Elektro
- Weight:
- 145 t
- Standard tyres:
- 355/65-15
- Boom:
- UA
- Outrigger stabilisers:
- 4 2/4-fold
Sennebogen 875 M
- Weight:
- 165 t
- Boom:
- UA
Spare parts & Components
Get spare parts for Sennebogen 870M E Hybrid Elektro easily from our partners
Do your lookup for high quality parts for Sennebogen 870M E Hybrid Elektro online!
With a few, easy steps, you will find generic and genuine parts and replacements in well-catalogued lists. Wether you are dealer or an owner, LECTURA can lead you to the right direction.
Check the best offers from our partners and order the Material Handlers spare parts easily today - worldwide.
Transport
Material Handlers Transport & Shipping Services
In case you look for a transport your machine, apply our services. Look for the best fitting transport quotes for Material Handlers created on transport dimensions and weight. Our partners provide comprehensive options to satisfy your requirements.
Data provided by
News
Construction News by LECTURA 25.07.2026
New Wheeled Paver Delivers Impressive Performance in the Mont Blanc Tunnel
It’s a mammoth project: current plans foresee the complete renovation and modernisation of the Mont Blanc Tunnel over its full length of almost 12 km by 2042.