Visit Hidromek live at
Technical specs - HMK 102 B Alpha Hidromek
Specification
Notice: Every data listed is verified by LECTURA Specs team experts. However, incomplete data and mistakes might occur. Contact our team with any change suggestion.
- Weight
- 9.3 t
- Standard tyres
- VR 16/70x20-12PR HR 16.9-28 14PRVR
- Bucket width
- 2.42 m
- Bucket capacity
- 1.1 m³
- Bucket capacity backhoe
- 0.18 m³
- Drive
- A
- Transport length
- 6.017 m
- Transport width
- 2.422 m
- Transport height
- 3.604 m
- Tear-out force
- 72.32 kN
- Tear-out force backhoe
- 68.8 kN
- Max. Reach horizontal
- 6.819 m
- Dredging depth
- 5.606 m
- Max. discharge height
- 4.705 m
- Travel speed
- 40 km/h
- Model series
- HMK
- Engine manuf.
- Perkins
- Engine type
- 904J-E36TA
- Engine power
- 74.4 kW
- Displacement
- 3.621 l
- Revolutions at max torque
- 2200 rpm
- Max. torque
- 430/1500 Nm
- No. of cylinders
- 4
- Cylinder bore x stroke
- 98x120 mm
- Emission level
- V/Tier 4 f
Basic model incl. ROPS cabin, standard shovel, rear with backhoe and standard bucket
Special equipment
- Outrigger stabilisers
-
Yes
- Clamshell
-
Yes
- Forklift utility
-
Yes
- Grabber
-
No
- Diesel particulate filter
-
Yes
- Aircondition
-
Yes
Download datasheets (PDF)
Hidromek HMK 102 B Alpha FAQ
How much does the Hidromek HMK 102 B Alpha weigh?
What are the transport dimensions of the Hidromek HMK 102 B Alpha backhoe loader?
What is the travel speed of the Hidromek HMK 102 B Alpha backhoe loader?
What are the undercarriage specifications of the Hidromek HMK 102 B Alpha backhoe loader?
What are the excavation performance specifications of the Hidromek HMK 102 B Alpha?
What are the tear-out force ratings of the Hidromek HMK 102 B Alpha backhoe loader?
What is the maximum discharge height of the Hidromek HMK 102 B Alpha?
What are the primary work tool specifications of the Hidromek HMK 102 B Alpha backhoe loader?
How much is a Hidromek HMK 102 B Alpha Backhoe loader (2021u20132025) worth?
Events
Visit Hidromek live at
Machine inspection
Ask for inspection of your Hidromek HMK 102 B Alpha from experts
Mevas is an international operating inspection service for used heavy machinery. Construction machinery inspectors are available in more than 20 countries.
Use this service to minimise the risk when buying used equipment. An inspection by Mevas costs less than repairing a defective hydraulic cylinder.
Provided by:
Buy & Rent
Compare Hidromek HMK 102 B Alpha with similar Backhoe Loaders
Hidromek HMK 102 B Alpha
- Weight:
- 9.3 t
- Standard tyres:
- VR 16/70x20-12PR HR 16.9-28 14PRVR
- Bucket width:
- 2.42 m
- Bucket capacity:
- 1.1 m³
New Holland 655 D
- Weight:
- 7.52 t
- Standard tyres:
- 16.5/85-28
- Bucket capacity:
- 1 m³
Hydrema H 906 E-ESD
- Weight:
- 9.2 t
- Standard tyres:
- 500/70x28
- Bucket width:
- 2.55 m
- Bucket capacity:
- 1.4 m³
Terex-Fermec 760
- Weight:
- 8.2 t
- Standard tyres:
- 16.9x30
- Bucket capacity:
- 1 m³
Fiat-Hitachi FB 100
- Weight:
- 8.1 t
- Standard tyres:
- 18.4-26/12.5-80
- Bucket capacity:
- 1 m³
Sell Hidromek HMK 102 B Alpha
Backhoe Loaders appraisal with LECTURA Valuation
Whether you need to get value of your Hidromek HMK 102 B Alpha or valuation of your Backhoe Loaders fleet, LECTURA Valuation will help. Simply fill the equipment details and see the values for Backhoe Loaders in few clicks.
Data provided by
Spare parts & Components
Get spare parts for Hidromek HMK 102 B Alpha easily from our partners
Do your lookup for high quality parts for Hidromek HMK 102 B Alpha online!
With a few, easy steps, you will find generic and genuine parts and replacements in well-catalogued lists. Wether you are dealer or an owner, LECTURA can lead you to the right direction.
Check the best offers from our partners and order the Backhoe Loaders spare parts easily today - worldwide.
Transport
Backhoe Loaders Transport & Shipping Services
In case you look into transport options for your machine, take advantage of our services. Examine the most appropriate transport quotes for Backhoe Loaders built on dimensions and weight. Our partners provide major options to satisfy your demands.
Data provided by
News
Construction News by LECTURA 28.06.2026
CECE Technical Week June 2026: Advancing alignment across digital, environmental and machinery frameworks
The CECE Technical Commission (TC) and its Project Teams (PTs) convened for the second quarterly "Technical Week" meetings of the year, held from15th to 18th June.