PH T05 SLD 3 Palfinger PH T05 SLD 3 Specifications & Technical Data (2018—2025)

Lifting force: 50kN – Construction type: S – max. total weight: 7.5t – Axles: 2 – Model series: SLD – max. hook height: m

Visit Palfinger live at

Technical specs - PH T05 SLD 3 Palfinger

Specification

Notice: Every data listed is verified by LECTURA Specs team experts. However, incomplete data and mistakes might occur. Contact our team with any change suggestion.

Lifting force
50 kN
Construction type
S
max. total weight
7.5 t
Axles
2
Model series
SLD

More technical details, like: max. hook height, max. container length, max. container volume are available in the full technical specs.

Basic unit, unmounted K = articulated hook arm, SZA = semi-trailer, KO = combination of articulated hook arm and winch for slip-off/roll-off container, S = thrust hook arm, SK = articulated thrust hook arm, SiloT = silo transporter

Special equipment

telescopic
Yes
with add. articulation
No
3-way tipping device
No

Download datasheets (PDF)

Events

Visit Palfinger live at

NordBau 2026

Holstenhallen Neumünster, Germany

September
NordBau 2026

Buy & Rent

Compare Palfinger PH T05 SLD 3 with similar Roll-off Tippers

Palfinger PH T05 SLD 3

Palfinger PH T05 SLD 3

Lifting force:
50 kN
Construction type:
S
max. total weight:
7.5 t
Axles:
2
Atlas ARK 62

Atlas ARK 62

Lifting force:
60 kN
Construction type:
K
max. total weight:
10 t
Axles:
2

Transport

Roll-off Tippers Transport & Shipping Services

In case you want to transport your machine, apply our services. Query the ideal transport quotes for Roll-off Tippers created on transport dimensions and weight. Our partners offer comprehensive services to meet your requirements.

Data provided by Lectura logo

News

Lifting and access News by LECTURA 06.08.2026

PALFINGER Expands Its Outreach At Sea

PALFINGER Expands Its Outreach At Sea

With the new PFM 1200, PALFINGER is introducing a marine crane tailored to the growing demands of modern service vessels and workboats, particularly in the aquaculture sector. The first unit will be delivered in September.