GEP 65 Olympian GEP 65 Specifications & Technical Data (2006—2014)

Nominal output: 60KVA – Nominal current: 87A – Nominal voltage: 400V – Weight: 1300kg – Type of cooling: w – Transport length: 2.3m

Technical specs - GEP 65 Olympian

Specification

Notice: Every data listed is verified by LECTURA Specs team experts. However, incomplete data and mistakes might occur. Contact our team with any change suggestion.

Nominal output
60 KVA
Nominal current
87 A
Nominal voltage
400 V
Weight
1300 kg
Type of cooling
w
Transport length
2.3 m
Transport width
1.12 m
Transport height
1.525 m
Model series
GEP
Engine manuf.
Perkins
Engine type
1104
Engine power
48 kW

More technical details, like: carriage, dimension lxwxh, displacement, revolutions at max torque, max. torque, no. of cylinders, cylinder bore x stroke, emission level are available in the full technical specs.

Basic model

Special equipment

Electric starter
Yes
silenced
Yes
Earth leakage monitor
No
Automatic oil deficiency shutoff
No
Thermo magnetic switch
No
Ground fault circuit interrupter
No

Download datasheets (PDF)

Buy & Rent

Compare Olympian GEP 65 with similar Diesel Power Generators

Olympian GEP 65

Olympian GEP 65

Nominal output:
60 KVA
Nominal current:
87 A
Nominal voltage:
400 V
Weight:
1300 kg

Spare parts & Components

Get spare parts for Olympian GEP 65 easily from our partners

Spare parts

Do your lookup for high quality parts for Olympian GEP 65 online!
With a few, easy steps, you will find generic and genuine parts and replacements in well-catalogued lists. Wether you are dealer or an owner, LECTURA can lead you to the right direction.
Check the best offers from our partners and order the Diesel Power Generators spare parts easily today - worldwide.

Transport

Diesel Power Generators Transport & Shipping Services

In case you look into transport options for your machine, apply our services. Check the ideal transport quotes for Diesel Power Generators built on transport dimensions and weights. Our partners provide large-scale services to meet your demands.

Data provided by Lectura logo

News

Construction News by LECTURA 12.08.2026