Hüdig Step 75 Specifications & Technical Data (2006-2015)

Nominal output: 75KVA – Nominal current: 108A – Nominal voltage: 400V – Weight: 1988kg – Type of cooling: w – Model series: Step

Technical specs - Step 75 Hüdig

Specification

Notice: Every data listed is verified by LECTURA Specs team experts. However, incomplete data and mistakes might occur. Contact our team with any change suggestion.

Nominal output
75 KVA
Nominal current
108 A
Nominal voltage
400 V
Weight
1988 kg
Type of cooling
w
Model series
Step
Engine manuf.
Deutz
Engine type
BF4M2012C
Engine power
68.3 kW

More technical details, like: carriage, transport length, transport width, transport height, dimension lxwxh, displacement, revolutions at max torque, max. torque, no. of cylinders, cylinder bore x stroke, emission level are available in the full technical specs.

Basic model

Special equipment

Electric starter
Yes
silenced
Yes
Earth leakage monitor
No
Automatic oil deficiency shutoff
No
Thermo magnetic switch
No
Ground fault circuit interrupter
No

Carbon footprint calculator for Diesel Power Generators

Use the ERA equipment CO2 Calculator to estimate the CO2 footprint per hour of use of the Hüdig Step 75 or alternative Diesel Power Generators.

The carbon emission evaluation can be carried out based on different energy consumption scenarios or other variables.

or visit the ERA Equipment CO2 Calculator to find out how to optimise your CO2 emissions.

service provided by ERA — European Rental Association

Download datasheets (PDF)

Buy & Rent

Compare Hüdig Step 75 with similar Diesel Power Generators

Hüdig Step 75

Hüdig Step 75

Nominal output:
75 KVA
Nominal current:
108 A
Nominal voltage:
400 V
Weight:
1988 kg

Transport

Diesel Power Generators Transport & Shipping Services

In case you look for a transport your machine, take advantage of our services. Examine the ideal transport quotes for Diesel Power Generators built on dimensions and weight. Our partners provide major options to meet your demands.

Data provided by Lectura logo

Events & News

Construction News by LECTURA 10.12.2024