Visit Bobcat live at
Technical specs - PL80 Bobcat
Specification
Notice: Every data listed is verified by LECTURA Specs team experts. However, incomplete data and mistakes might occur. Contact our team with any change suggestion.
- Mast height
- 7 m
- Operating weight
- 650 kg
- Total width
- 1397 mm
- Total length
- 2768 mm
- Total height
- 2600 mm
- Frequency
- 60 Hz
- Lamps
- 4
- Voltage
- 240 V
- Engine manuf.
- Kubota
- Engine type
- D1105
- Engine power
- 11.5 kW
- Displacement
- 1.1 l
- No. of cylinders
- 3
- Emission level
- Tier 4 Final
More technical details, like: light coverage, mast type, power source, operating time, model series, dimension lxwxh, revolutions at max torque, max. torque, cylinder bore x stroke, weight are available in the full technical specs.
Download datasheets (PDF)
Events
Visit Bobcat live at
Buy & Rent
Compare Bobcat PL80 with similar Light Towers
Bobcat PL80
- Mast height:
- 7 m
- Operating weight:
- 650 kg
- Total width:
- 1397 mm
- Total length:
- 2768 mm
JCB LT9
- Mast height:
- 9 m
- Operating weight:
- 911 kg
- Total width:
- 2450 mm
- Total length:
- 2330 mm
JLG LED-8
- Mast height:
- 8.1 m
- Operating weight:
- 1580 kg
- Total width:
- 1750 mm
- Total length:
- 2500 mm
Endress EFA 830 S6
- Mast height:
- 8.3 m
- Operating weight:
- 1600 kg
- Total width:
- 1600 mm
- Total length:
- 4900 mm
Spare parts & Components
Get spare parts for Bobcat PL80 easily from our partners
Do your lookup for high quality parts for Bobcat PL80 online!
With a few, easy steps, you will find generic and genuine parts and replacements in well-catalogued lists. Wether you are dealer or an owner, LECTURA can lead you to the right direction.
Check the best offers from our partners and order the Light Towers spare parts easily today - worldwide.
Transport
Light Towers Transport & Shipping Services
In case you need to transport your machine, apply our services. Seek for favourable transport quotes for Light Towers based on transport dimensions and weights. Our partners provide large-scale services to fit your needs.
Data provided by
News
Construction News by LECTURA 28.06.2026
CECE Technical Week June 2026: Advancing alignment across digital, environmental and machinery frameworks
The CECE Technical Commission (TC) and its Project Teams (PTs) convened for the second quarterly "Technical Week" meetings of the year, held from15th to 18th June.