FS 30 E Gölz FS 30 E Specifications & Technical Data (2021—2026)

Weight: 142kg – Cutting depth: 320mm – Disc Ø: 800mm – Saw blade intake: 25.4mm – Transport length: 1.22m – Transport width: 0.68m

Visit Gölz live at

Technical specs - FS 30 E Gölz

Specification

Notice: Every data listed is verified by LECTURA Specs team experts. However, incomplete data and mistakes might occur. Contact our team with any change suggestion.

Weight
142 kg
Cutting depth
320 mm
Disc Ø
800 mm
Saw blade intake
25.4 mm
Transport length
1.22 m
Transport width
0.68 m
Transport height
0.88 m
Cutting shaft speed
2300 min-1
Power source
Electric
Model series
E
Engine manuf.
k.A.
Engine type
E 400 V
Engine power
11 kW

More technical details, like: floor type, dimension lxwxh, displacement, revolutions at max torque, max. torque, no. of cylinders, cylinder bore x stroke, emission level are available in the full technical specs.

Events

Visit Gölz live at

GaLaBau 2026

Nürnberg, Germany

GaLaBau 2026

Buy & Rent

Compare Gölz FS 30 E with similar Floor Saws

Gölz FS 30 E

Gölz FS 30 E

Weight:
142 kg
Cutting depth:
320 mm
Disc Ø:
800 mm
Saw blade intake:
25.4 mm
Gölz FS 190

Gölz FS 190

Weight:
125 kg
Cutting depth:
190 mm
Disc Ø:
500 mm

Spare parts & Components

Get spare parts for Gölz FS 30 E easily from our partners

Spare parts

Do your lookup for high quality parts for Gölz FS 30 E online!
With a few, easy steps, you will find generic and genuine parts and replacements in well-catalogued lists. Wether you are dealer or an owner, LECTURA can lead you to the right direction.
Check the best offers from our partners and order the Floor Saws spare parts easily today - worldwide.

Transport

Floor Saws Transport & Shipping Services

In case you want to transport your machine, take advantage of our services. Ask for the best fitting transport quotes for Floor Saws formed on dimensions and weight. Our partners offer major options to satisfy your wishes.

Data provided by Lectura logo

News

Construction News by LECTURA 21.08.2026

Building a bright future on hard rock

Building a bright future on hard rock

Within the context of an ongoing infrastructure project, the Garden River First Nation Indigenous community is supplying graded aggregates for the rehabilitation of a 16-kilometre section of Highway 17A.