Visit Heide-Pumpen live at
Technical specs - HD 50 Heide-Pumpen
Specification
Notice: Every data listed is verified by LECTURA Specs team experts. However, incomplete data and mistakes might occur. Contact our team with any change suggestion.
- Delivery rate
- 52 m³/h
- Feed pressure
- 16.9 bar
- Suction Lift
- 7 m
- Weight
- 620 kg
- Model series
- HD
More technical details, like: engine manuf., engine type, engine power, dimension lxwxh, displacement, revolutions at max torque, max. torque, no. of cylinders, cylinder bore x stroke, emission level are available in the full technical specs.
Basic model with outlet armature, without hose lines
Special equipment
- Carriage
-
No
- Road traffic licensed carriage
-
No
- High pressure type
-
No
Events
Visit Heide-Pumpen live at
Buy & Rent
Compare Heide-Pumpen HD 50 with similar Diesel Flush Pumps
Heide-Pumpen HD 50
- Delivery rate:
- 52 m³/h
- Feed pressure:
- 16.9 bar
- Suction Lift:
- 7 m
- Weight:
- 620 kg
Hüdig HC 170/00
- Delivery rate:
- 43.5 m³/h
- Feed pressure:
- 14.5 bar
- Suction Lift:
- 7 m
- Weight:
- 420 kg
Spare parts & Components
Get spare parts for Heide-Pumpen HD 50 easily from our partners
Do your lookup for high quality parts for Heide-Pumpen HD 50 online!
With a few, easy steps, you will find generic and genuine parts and replacements in well-catalogued lists. Wether you are dealer or an owner, LECTURA can lead you to the right direction.
Check the best offers from our partners and order the Diesel Flush Pumps spare parts easily today - worldwide.
Transport
Diesel Flush Pumps Transport & Shipping Services
In case you want a transport for your machine, apply our services. Query the most appropriate transport quotes for Diesel Flush Pumps built on transport dimensions and weight. Our partners provide comprehensive services to satisfy your demands.
Data provided by
News
Construction News by LECTURA 27.07.2026
New Wheeled Paver Delivers Impressive Performance in the Mont Blanc Tunnel
It’s a mammoth project: current plans foresee the complete renovation and modernisation of the Mont Blanc Tunnel over its full length of almost 12 km by 2042.