Technical specs - W270C LR New Holland
Specification
Notice: Every data listed is verified by LECTURA Specs team experts. However, incomplete data and mistakes might occur. Contact our team with any change suggestion.
- Weight
- 25.7 t
- Standard tyres
- 26.5 R 25 XHATL
- Bucket capacity
- 4 m³
- Bucket capacity min.
- 4 m³
- Bucket capacity max.
- 4.6 m³
- Steering mode
- KL
- Transport length
- 8.895 m
- Transport width
- 2.99 m
- Transport height
- 3.715 m
- Travel speed
- 40 km/h
- Model series
- W
- Engine manuf.
- CNH
- Engine type
- F2CF-E614B
- Engine power
- 239 kW
- Displacement
- 8.7 l
- Revolutions at max torque
- 1800 rpm
More technical details, like: bucket width, max. discharge height, turning radius outside, lifting force, dimension lxwxh, max. torque, no. of cylinders, cylinder bore x stroke, emission level are available in the full technical specs.
Basic model with ROPS cabin, std. shovel and teeth
Special equipment
- Diesel particulate filter
-
No
- Swing loader
-
No
- telescopic
-
No
- Aircondition
-
Yes
- Quick hitch hydr.
-
No
- Quick hitch mech.
-
No
Download datasheets (PDF)
New Holland W270C LR FAQ
How much does the New Holland W270C LR weigh?
What are the transport dimensions of the New Holland W270C LR wheel loader?
What is the travel speed of the New Holland W270C LR wheel loader?
What are the standard tyres of the New Holland W270C LR wheel loader?
What is the steering mode of the New Holland W270C LR?
What are the bucket capacity specifications of the New Holland W270C LR wheel loader?
How much is a New Holland W270C LR Wheel loader (2012u20132015) worth?
New Holland W270C LR overview
New Holland W270C LR features overview
Engine / Powertrain / Drivetrain
Hydraulic system
Operator's cab
Bucket and Ground Engaging Tools
Machine inspection
Ask for inspection of your New Holland W270C LR from experts
Mevas is an international operating inspection service for used heavy machinery. Construction machinery inspectors are available in more than 20 countries.
Use this service to minimise the risk when buying used equipment. An inspection by Mevas costs less than repairing a defective hydraulic cylinder.
Provided by:
Buy & Rent
Compare New Holland W270C LR with similar Wheel Loaders
New Holland W270C LR
- Weight:
- 25.7 t
- Standard tyres:
- 26.5 R 25 XHATL
- Bucket capacity:
- 4 m³
- Bucket capacity min.:
- 4 m³
Hidromek HMK 640 WL
- Weight:
- 26.3 t
- Standard tyres:
- 26.5 R 25 L3
- Bucket capacity:
- 4.2 m³
- Bucket capacity min.:
- 4.2 m³
Terex TL 420
- Weight:
- 22.3 t
- Standard tyres:
- 26.5 R25
- Bucket capacity:
- 4.2 m³
- Bucket capacity min.:
- 4.2 m³
TORO 7
- Weight:
- 26.2 t
- Standard tyres:
- 18.00x25L5S
- Bucket capacity:
- 4.6 m³
- Bucket capacity min.:
- 4.6 m³
Belaz 68010
- Weight:
- 28 t
- Standard tyres:
- 26.5-25 НС32
- Bucket capacity:
- 4.8 m³
Do you want to see more detailed comparison?
Show me!Sell New Holland W270C LR
Wheel Loaders appraisal with LECTURA Valuation
Whether you need to calculate value of your New Holland W270C LR or valuation of your Wheel Loaders fleet, LECTURA Valuation will help. Simply fill the machine details and see the pricing information for Wheel Loaders in few clicks.
Data provided by
Spare parts & Components
Get spare parts for New Holland W270C LR easily from our partners
Do your lookup for high quality parts for New Holland W270C LR online!
With a few, easy steps, you will find generic and genuine parts and replacements in well-catalogued lists. Wether you are dealer or an owner, LECTURA can lead you to the right direction.
Check the best offers from our partners and order the Wheel Loaders spare parts easily today - worldwide.
Transport
Wheel Loaders Transport & Shipping Services
In case you look for a transport your machine, apply our services. Query the ideal transport quotes for Wheel Loaders created on transport dimensions and weights. Our partners provide large-scale services to meet your requirements.
Data provided by
News
Construction News by LECTURA 27.06.2026
CECE Technical Week June 2026: Advancing alignment across digital, environmental and machinery frameworks
The CECE Technical Commission (TC) and its Project Teams (PTs) convened for the second quarterly "Technical Week" meetings of the year, held from15th to 18th June.