Technical specs - TC90 Messersi
Specification
Notice: Every data listed is verified by LECTURA Specs team experts. However, incomplete data and mistakes might occur. Contact our team with any change suggestion.
- Transport width
- 0.8 m
- Net load
- 0.9 t
- Model series
- TC
- Engine manuf.
- N/A
- Engine type
- N/a
- Engine power
- 9.6 kW
- No. of cylinders
- 2
- Emission level
- Stage V
Basic model with ROPS cabin and std. trough
Special equipment
- Track adjustment
-
No
- Bucket
-
No
- Heated dump body
-
No
- Electric starter
-
No
- Trough liftable
-
No
- Aircondition
-
No
Messersi TC90 FAQ
What is the transport width of the Messersi TC90?
What is the material handling capacity of the Messersi TC90 tracked dumper?
How much is a Messersi TC90 Tracked dumper (2021u20132025) worth?
Machine inspection
Ask for inspection of your Messersi TC90 from experts
Mevas is an international operating inspection service for used heavy machinery. Construction machinery inspectors are available in more than 20 countries.
Use this service to minimise the risk when buying used equipment. An inspection by Mevas costs less than repairing a defective hydraulic cylinder.
Provided by:
Spare parts & Components
Get spare parts for Messersi TC90 easily from our partners
Do your lookup for high quality parts for Messersi TC90 online!
With a few, easy steps, you will find generic and genuine parts and replacements in well-catalogued lists. Wether you are dealer or an owner, LECTURA can lead you to the right direction.
Check the best offers from our partners and order the Tracked Dumpers spare parts easily today - worldwide.
Transport
Tracked Dumpers Transport & Shipping Services
In case you look for a transport your machine, apply our services. Search for the best fitting transport quotes for Tracked Dumpers created on transport dimensions and weights. Our partners provide large-scale options to satisfy your requirements.
Data provided by
News
Construction News by LECTURA 01.08.2026
Weekly overview 27.7. - 31.7. 2026
Interesting news from passed week in heavy machinery industry.