Technical specs - TP 380 Camisa
Specification
Notice: Every data listed is verified by LECTURA Specs team experts. However, incomplete data and mistakes might occur. Contact our team with any change suggestion.
- Weight
- 0.15 t
- Net load
- 0.35 t
- Dump capacity
- 0.12 m³
- Engine manuf.
- Briggs & Stratton
- Engine type
- EH 17
- Engine power
- 3.7 kW
Basic model with ROPS cabin and std. trough
Special equipment
- Track adjustment
-
No
- Bucket
-
No
- Heated dump body
-
No
- Electric starter
-
No
- Trough liftable
-
No
- Aircondition
-
No
Camisa TP 380 FAQ
How much does the Camisa TP 380 weigh?
What is the material handling capacity of the Camisa TP 380 tracked dumper?
How much is a Camisa TP 380 Tracked dumper (2003u20132004) worth?
Machine inspection
Ask for inspection of your Camisa TP 380 from experts
Mevas is an international operating inspection service for used heavy machinery. Construction machinery inspectors are available in more than 20 countries.
Use this service to minimise the risk when buying used equipment. An inspection by Mevas costs less than repairing a defective hydraulic cylinder.
Provided by:
Spare parts & Components
Get spare parts for Camisa TP 380 easily from our partners
Do your lookup for high quality parts for Camisa TP 380 online!
With a few, easy steps, you will find generic and genuine parts and replacements in well-catalogued lists. Wether you are dealer or an owner, LECTURA can lead you to the right direction.
Check the best offers from our partners and order the Tracked Dumpers spare parts easily today - worldwide.
Transport
Tracked Dumpers Transport & Shipping Services
In case you look into transport options for your machine, apply our services. Query the best fitting transport quotes for Tracked Dumpers created on transport dimensions and weights. Our partners provide large-scale services to satisfy your requirements.
Data provided by
News
Construction News by LECTURA 28.07.2026
New Wheeled Paver Delivers Impressive Performance in the Mont Blanc Tunnel
It’s a mammoth project: current plans foresee the complete renovation and modernisation of the Mont Blanc Tunnel over its full length of almost 12 km by 2042.