Visit Hydra Ram live at
Technical specs - MK-55 T Gebiss Hydra Ram
Specification
Notice: Every data listed is verified by LECTURA Specs team experts. However, incomplete data and mistakes might occur. Contact our team with any change suggestion.
- Operating weight
- 5.32 t
- Carrying device
- 55-78 t
- Opening
- 400 mm
- Wrench opening depth
- 460 mm
- Breakout force
- 3923 kN
- Total length
- 2980 mm
- Oil flow
- 500 l/min
- Model series
- MK
More technical details, like: total width, cutting force are available in the full technical specs.
Events
Visit Hydra Ram live at
Machine inspection
Ask for inspection of your Hydra Ram MK-55 T Gebiss from experts
Mevas is an international operating inspection service for used heavy machinery. Construction machinery inspectors are available in more than 20 countries.
Use this service to minimise the risk when buying used equipment. An inspection by Mevas costs less than repairing a defective hydraulic cylinder.
Provided by:
Sell Hydra Ram MK-55 T Gebiss
Multi-processors appraisal with LECTURA Valuation
Whether you need to get price of your Hydra Ram MK-55 T Gebiss or valuation of your Multi-processors fleet, LECTURA Valuation will help. Simply fill the form and see the pricing information for Multi-processors in few clicks.
Data provided by
Spare parts & Components
Get spare parts for Hydra Ram MK-55 T Gebiss easily from our partners
Do your lookup for high quality parts for Hydra Ram MK-55 T Gebiss online!
With a few, easy steps, you will find generic and genuine parts and replacements in well-catalogued lists. Wether you are dealer or an owner, LECTURA can lead you to the right direction.
Check the best offers from our partners and order the Multi-processors spare parts easily today - worldwide.
Transport
Multi-processors Transport & Shipping Services
In case you look into transport options for your machine, utilise our services. Check the best fitting transport quotes for Multi-processors created on transport dimensions and machine weight. Our partners provide extensive services to satisfy your requirements.
Data provided by
News
Construction News by LECTURA 23.07.2026
New Wheeled Paver Delivers Impressive Performance in the Mont Blanc Tunnel
It’s a mammoth project: current plans foresee the complete renovation and modernisation of the Mont Blanc Tunnel over its full length of almost 12 km by 2042.