Visit Sandvik live at
Technical specs - BR5011 Sandvik
Specification
Notice: Every data listed is verified by LECTURA Specs team experts. However, incomplete data and mistakes might occur. Contact our team with any change suggestion.
- Weight
- 4750 kg
- No. of Blows
- 530 1/min
- Carrying device
- 43-80 t
- Tool Ø
- 190 mm
- Oil flow
- 380 l/min
- Operating pressure
- 170 bar
- Model series
- BR
More technical details, like: impact energy, total length are available in the full technical specs.
Basic model without chisel and without adapter for excavator
Special equipment
- Central lubrication
-
Yes
- silenced
-
Yes
- Subaqueous equipment
-
Yes
- Quick hitch mech.
-
No
Events
Visit Sandvik live at
Machine inspection
Ask for inspection of your Sandvik BR5011 from experts
Mevas is an international operating inspection service for used heavy machinery. Construction machinery inspectors are available in more than 20 countries.
Use this service to minimise the risk when buying used equipment. An inspection by Mevas costs less than repairing a defective hydraulic cylinder.
Provided by:
Spare parts & Components
Get spare parts for Sandvik BR5011 easily from our partners
Do your lookup for high quality parts for Sandvik BR5011 online!
With a few, easy steps, you will find generic and genuine parts and replacements in well-catalogued lists. Wether you are dealer or an owner, LECTURA can lead you to the right direction.
Check the best offers from our partners and order the Hydraulic Breakers spare parts easily today - worldwide.
Transport
Hydraulic Breakers Transport & Shipping Services
In case you look into transport options for your machine, utilise our services. Examine the ideal transport quotes for Hydraulic Breakers built on transport dimensions and machine weight. Our partners provide extensive options to meet your demands.
Data provided by
News
Construction News by LECTURA 23.07.2026
New Wheeled Paver Delivers Impressive Performance in the Mont Blanc Tunnel
It’s a mammoth project: current plans foresee the complete renovation and modernisation of the Mont Blanc Tunnel over its full length of almost 12 km by 2042.