PD50 VTN PD50 Specifications & Technical Data (2025—2026)

Operating weight: 4.97t – Carrying device: 45-70t – Opening: 1535mm – Total length: 2730mm – Total width: 2355mm – Oil flow: 350/500l/min

Technical specs - PD50 VTN

Specification

Notice: Every data listed is verified by LECTURA Specs team experts. However, incomplete data and mistakes might occur. Contact our team with any change suggestion.

Operating weight
4.97 t
Carrying device
45-70 t
Opening
1535 mm
Total length
2730 mm
Total width
2355 mm
Oil flow
350/500 l/min
Model series
PD

More technical details, like: wrench opening depth, breakout force are available in the full technical specs.

Basic model without hoselines and adapter for excavator

Special equipment

endless rotation
Yes
Piston rod protections
Yes
Quick hitch mech.
No

Download datasheets (PDF)

Machine inspection

Ask for inspection of your VTN PD50 from experts

Machine inspection

Mevas is an international operating inspection service for used heavy machinery. Construction machinery inspectors are available in more than 20 countries.

Use this service to minimise the risk when buying used equipment. An inspection by Mevas costs less than repairing a defective hydraulic cylinder.

Provided by: Mevas — The Heavy Equipment Inspectors

Spare parts & Components

Get spare parts for VTN PD50 easily from our partners

Spare parts

Do your lookup for high quality parts for VTN PD50 online!
With a few, easy steps, you will find generic and genuine parts and replacements in well-catalogued lists. Wether you are dealer or an owner, LECTURA can lead you to the right direction.
Check the best offers from our partners and order the Concrete Crushers spare parts easily today - worldwide.

Transport

Concrete Crushers Transport & Shipping Services

In case you look for a transport your machine, take advantage of our services. Examine the most appropriate transport quotes for Concrete Crushers built on dimensions and weight. Our partners provide major options to satisfy your demands.

Data provided by Lectura logo

News

Construction News by LECTURA 10.07.2026