Visit Komatsu live at
Technical specs - JMSD 50 R Komatsu
Specification
Notice: Every data listed is verified by LECTURA Specs team experts. However, incomplete data and mistakes might occur. Contact our team with any change suggestion.
- Operating weight
- 6.35 t
- Carrying device
- 60 t
- Opening
- 813 mm
- Wrench opening depth
- 864 mm
- Breakout force
- 3180 kN
- Total length
- 4064 mm
- Model series
- JMSD
More technical details, like: total width, oil flow are available in the full technical specs.
Basic model without hoselines and adapter for excavator
Special equipment
- endless rotation
-
No
- Piston rod protections
-
No
- Quick hitch mech.
-
No
Events
Visit Komatsu live at
Machine inspection
Ask for inspection of your Komatsu JMSD 50 R from experts
Mevas is an international operating inspection service for used heavy machinery. Construction machinery inspectors are available in more than 20 countries.
Use this service to minimise the risk when buying used equipment. An inspection by Mevas costs less than repairing a defective hydraulic cylinder.
Provided by:
Spare parts & Components
Get spare parts for Komatsu JMSD 50 R easily from our partners
Do your lookup for high quality parts for Komatsu JMSD 50 R online!
With a few, easy steps, you will find generic and genuine parts and replacements in well-catalogued lists. Wether you are dealer or an owner, LECTURA can lead you to the right direction.
Check the best offers from our partners and order the Concrete Crushers spare parts easily today - worldwide.
Transport
Concrete Crushers Transport & Shipping Services
In case you need to transport your machine, apply our services. Examine the most appropriate transport quotes for Concrete Crushers created on transport dimensions and weight. Our partners provide comprehensive options to satisfy your requirements.
Data provided by
News
Construction News by LECTURA 25.07.2026
New Wheeled Paver Delivers Impressive Performance in the Mont Blanc Tunnel
It’s a mammoth project: current plans foresee the complete renovation and modernisation of the Mont Blanc Tunnel over its full length of almost 12 km by 2042.