TR0610E1024 AMI Excavator Bucket Specs (2021 - 2026)

Carrying device: 2.72-4.54t – Weight: 68kg – Bucket width: 0.254m – Model series: TR – Bucket capacity: m³ –

Technical specs - TR0610E1024 AMI

Specification

Notice: Every data listed is verified by LECTURA Specs team experts. However, incomplete data and mistakes might occur. Contact our team with any change suggestion.

Carrying device
2.72-4.54 t
Weight
68 kg
Bucket width
0.254 m
Model series
TR

Special equipment

V-ditch bucket
Yes
Skeleton bucket
No
Digging bucket
No
General purpose bucket
No
Rock bucket
No
Ditching & Grading bucket
No

Machine inspection

Ask for inspection of your AMI TR0610E1024 from experts

Machine inspection

Mevas is an international operating inspection service for used heavy machinery. Construction machinery inspectors are available in more than 20 countries.

Use this service to minimise the risk when buying used equipment. An inspection by Mevas costs less than repairing a defective hydraulic cylinder.

Provided by: Mevas — The Heavy Equipment Inspectors

Buy & Rent

Compare AMI TR0610E1024 with similar Excavator buckets

AMI TR0610E1024

AMI TR0610E1024

Carrying device:
2.72-4.54 t
Weight:
68 kg
Bucket width:
0.254 m
Model series:
TR
Werk-Brau EX12SD

Werk-Brau EX12SD

Carrying device:
12 t
Bucket width:
0.457-1.067 m
Model series:
EX

Spare parts & Components

Get spare parts for AMI TR0610E1024 easily from our partners

Spare parts

Do your lookup for high quality parts for AMI TR0610E1024 online!
With a few, easy steps, you will find generic and genuine parts and replacements in well-catalogued lists. Wether you are dealer or an owner, LECTURA can lead you to the right direction.
Check the best offers from our partners and order the Excavator buckets spare parts easily today - worldwide.

Transport

Excavator buckets Transport & Shipping Services

In case you look for a transport your machine, take advantage of our services. Look for the ideal transport quotes for Excavator buckets created on machine's dimensions and weight. Our partners provide various options to meet your requirements.

Data provided by Lectura logo

News

Construction News by LECTURA 22.06.2026