Hiab XS 622 E-7 HIPRO Jib 150 X-4
- Load Torque:
- 459 kNm
- machine length:
- 2.549 m
- machine width:
- 1.58 m
- machine height:
- 2.673 m
Notice: Every data listed is verified by LECTURA Specs team experts. However, incomplete data and mistakes might occur. Contact our team with any change suggestion.
More technical details, like: carrying capacity, max. carrying capacity, at reach, max. hook height, required power, model series are available in the full technical specs.
unmounted without accessories LMB = load torque limit Schwb.= pivot range
See the ERA equipment CO2 Calculator to track the CO2 footprint per hour of use of the Hiab XS 622 E-7 HIPRO Jib 150 X-4 or alternative Hydraulic loading cranes.
The carbon emission analysis can be carried out based on different fuel consumption scenarios or other variables.
or go directly to the ERA Equipment CO2 Calculator to find out how to optimise your carbon footprint.
service provided by
We analyze most relevant deals from many sources about Hydraulic loading cranes.
Check the selection of the best offers on liked classified portals presenting second hand Hydraulic loading cranes to buy in many countries.
Get in touch for more details:
Do your lookup for high quality parts for Hiab XS 622 E-7 HIPRO Jib 150 X-4 online!
With a few, easy steps, you will find generic and genuine parts and replacements in well-catalogued lists. Wether you are dealer or an owner, LECTURA can lead you to the right direction.
Check the best offers from our partners and order the Hydraulic loading cranes spare parts easily today - worldwide.
In case you want a transport for your machine, utilise our services. Look for the best fitting transport quotes for Hydraulic loading cranes built on transport dimensions and machine weight. Our partners provide extensive options to satisfy your demands.
Data provided by
The next generation of Liebherr luffing jib cranes has arrived. The 440 HC-L easily manages an out-of-service position of less than eleven metres, reducing the space required. Lifting capacity has been increased, new materials have found their way into crane production and assembly times are now shorter.