Tsurumi-Pumpen LB-1500 Specifications & Technical Data (2008-2024)

Delivery rate: 26m³/h – Pressure sidge: G2 – Delivery altitude: 17.3m – Power consumption: 1.5kW – Weight: 33kg – Model series: LB

Technical specs - LB-1500 Tsurumi-Pumpen

Specification

Notice: Every data listed is verified by LECTURA Specs team experts. However, incomplete data and mistakes might occur. Contact our team with any change suggestion.

Delivery rate
26 m³/h
Pressure sidge
G2
Delivery altitude
17.3 m
Power consumption
1.5 kW
Weight
33 kg
Model series
LB

Basic model with outlet armature

Special equipment

230 V
Yes
400 V
No
High pressure type
No
Leveling control
No
Normal pressure type
No

Carbon footprint calculator for Sewage Pumps

See the ERA equipment CO2 Calculator to find out the CO2 footprint per hour of use of the Tsurumi-Pumpen LB-1500 or alternative Sewage Pumps.

The footprint evaluation can be carried out using different biofuel scenarios or other variables.

or visit the ERA Equipment CO2 Calculator to find out how to optimise your carbon footprint.

service provided by ERA — European Rental Association

Download datasheets (PDF)

Buy & Rent

Compare Tsurumi-Pumpen LB-1500 with similar Sewage Pumps

Tsurumi-Pumpen LB-1500

Tsurumi-Pumpen LB-1500

Delivery rate:
26 m³/h
Pressure sidge:
G2
Delivery altitude:
17.3 m
Power consumption:
1.5 kW
Pumpex P 601 W

Pumpex P 601 W

Delivery rate:
27.6 m³/h
Pressure sidge:
G2-C
Delivery altitude:
15.3 m
Power consumption:
0.9 kW
WILO-EMU Pumpen KS 8E

WILO-EMU Pumpen KS 8E

Delivery rate:
23 m³/h
Pressure sidge:
G1 ¼ C
Delivery altitude:
17 m
Power consumption:
0.75 kW
ABS-Pumpen J 12 W

ABS-Pumpen J 12 W

Delivery rate:
26 m³/h
Pressure sidge:
G2-C
Delivery altitude:
16 m
Power consumption:
1.2 kW

Transport

Sewage Pumps Transport & Shipping Services

In case you look into transport options for your machine, apply our services. Examine the most appropriate transport quotes for Sewage Pumps built on transport dimensions and weights. Our partners provide large-scale options to satisfy your demands.

Data provided by Lectura logo

Events & News

Construction News by LECTURA 06.10.2024

Renovating with Ringlock scaffolding solutions

Renovating with Ringlock scaffolding solutions

A quartet of European renovation and restoration projects across Europe showcases how Doka, a leading global formwork and scaffolding expert, delivers reliable, cost-effective scaffolding solutions tailored to meet the unique demands of renovation projects.