Lectura specs Construction machinery Dumper Dumper Terex Terex PT 6 AWS specifications

Technical specs - PT 6 AWS Terex

Notice: Every data listed is verified by LECTURA Specs team experts. However, incomplete data and mistakes might occur. Contact our team with any change suggestion.

Weight 4 t
Net load 6 t
Dump capacity 3.65 m³
Dumper type V
Engine manuf. Perkins
Engine type 1004.42
Engine power 60 kW
Standard tyres ###
Transport length ###
Transport width ###
Transport height ###
Travel speed ###
Loading height ###
Turning radius outside ###
Engine power ###
Dimension lxwxh ###
Displacement ###
Revolutions at max torque ###
Max. torque ###
No. of cylinders ###
Cylinder bore x stroke ###
Weight ###
Emission level ###
Model Type ###
Driveline ###
ROPS ###
Engine Manufacturer ###
Engine Model ###
Rated Speed ###
Engine Output ###
Fuel ###
Drive ###
Std tyre size front ###
Tyre Size - Front ###
Tyre Size - Rear ###
Service Type ###
Height Over ROPS ###
Width ###
Overall Length ###
Wheelbase ###
Ground Clearance ###
Skip lip height - untipped ###
Turning Radius - Outside ###
Payload - Heaped ###
Payload - Struck ###
Payload - Water ###
Skip Payload ###
Travel Speed - Maximum ###
Operating Weight - Unladen ###

Basic model with ROPS cabin and std. trough

PT 6 AWS Terex - Special equipment

  • Diesel particulate filter
  • Bin heating
  • All-wheel drive
  • Track
  • Aircondition

Download data sheets - Terex PT 6 AWS

X

What do you think about this machine?


Sell your Terex PT 6 AWS for a good price

Receive the best purchase offer² within 48 hours¹ from the network of WeBuyHeavyMachines.com with over 1,000 international dealers.

Compare Terex PT 6 AWS with other models

Press 1 image

Terex PT 6 AWS

4t

6 t

3.65 m³

Terex products

Check out 14 Terex products here

More about Terex

Construction News by LECTURA 03.07.2020

Tunnel Boring Machine Charlotte completes connection tunnel drive
Tunnel Boring Machine Charlotte completes connection tunnel drive

The super sewer became one step closer to cleaning up the River Thames yesterday as tunnelling machine Charlotte completed her journey to Fulham, finishing a vital connection tunnel beneath the river.

More industry news